Teesside University’s Greig Building is home to the university’s Computer and Mathematical Sciences department. Following signs of failure within the existing aged bituminous roof coverings — including splits, blow holes, and surface crazing — it became essential to implement a waterproofing solution quickly to prevent the risk of water ingress, internal damage, and disruption to the university’s operations.

Stormcure was selected to provide a rapid and long-lasting waterproofing solution, beginning with a detailed survey of the three roof areas.

Explore the potential of Stormcure’s Protec FW-25 System >

Project Challenges

Stormcure’s Protec FW-25 system was selected as the ideal solution for the project due to its rapid curing capabilities, seamless waterproofing performance, and suitability for restoration applications. As a fully cold-applied liquid system, the works could be completed safely during university semester time without the need for hot works or disruption to staff and students.

The project commenced with all existing asphalt and SBS roof coverings being prepared and repaired where necessary. Blow holes, cracks, and uneven areas were levelled and filled using Stormcure Structural Repair Mortar to create a suitable substrate for the new waterproofing system.

All roof surfaces were then thoroughly cleaned and degreased to ensure optimum adhesion prior to application. A number of parapet walls and perimeter junctions had been identified during the survey as vulnerable points for potential water ingress. To ensure complete waterproof integrity across these details, the inner faces and tops of the parapets were overboarded using 3/4″ Stormcure-approved plywood, allowing them to be fully encapsulated within the new waterproofing system.

The Stormcure Solution

Thanks to the thixotropic formulation of Protec FW-25, the system could be applied easily to vertical surfaces and complex detailing areas while minimising slumping and runoff during installation.

Stormcure’s heavy-duty GRP trims were then installed to provide clean, robust edge detailing around exposed perimeters before the main waterproofing application commenced.

Following primer application where required, the first coat of Protec FW-25 was installed and fully reinforced using PolyMat fiberglass reinforcement . Incorporating Stormcure’s proprietary MPeC technology, the system could be walked on and over-coated within approximately 30–60 minutes, enabling large sections of the roof to be made fully waterproof within hours.

Once the second coat of Protec FW-25 had been applied to complete the waterproofing system, designated maintenance walkways were formed by embedding quartz aggregate into an additional coat of liquid resin to provide a durable anti-slip finish.

Powered by Stormcure’s advanced MPeC composite membrane technology, proprietary to Roberts Group, the system combines modified polyester resin with CSM fibreglass reinforcement to create a waterproof membrane with exceptional durability, flexibility, and long-term performance.

The roof restoration works were completed successfully within the client’s target programme and budget requirements. Following final inspection by Stormcure Technical Services, the quality of workmanship carried out by the contractor was commended, and the client was issued with a Stormcure warranty.

The completed project now provides Teesside University with a fully seamless, long-term waterproofing solution that will protect the building for many years to come.