When disruptive leaks made the 85ᵗʰ-floor walkway at the Empire State Building unsafe, Stormcure took on the job, a solution was needed to quickly solve the issues while proving a hard-wearing trafficable solution. Protec FW-25 was chosen for its highly flexible, fast-curing application, with cure times of just 30-60 minutes, allowing daily operations to continue uninterrupted.

Explore the potential of Stormcure’s Protec FW-25 System >

Project Challenges

The Empire State Building in New York City is one of the world’s most iconic landmarks and was the first building ever constructed with over 100 stories.

With a roof height of 1,250ft, plus an antenna that extends the total height by another 204ft, the Empire State Building held the title of the tallest building in the world from 1931 until 1970. Its architectural significance and cultural impact earned it a place among the Seven Wonders of the Modern World in 1994.

When the walkway on the 85th floor developed leaks and was at risk of becoming unsafe, the client looked for a quick yet lasting solution for this challenge. The project demanded experience of working safely at extreme heights, and with thousands of visitors to the Empire State Building every day, operations must continue without disruption.

The Stormcure Solution

More than 1,860ft² of walkways and maintenance areas were expertly waterproofed to the highest standards using the Protec FW-25 system, ensuring a safe environment once again for maintenance and engineering personnel.

Stormcure selected Protec FW-25 for its exceptional versatility and rapid curing time. Known for its flexibility and durability, this system also comes with a 20-year warranty. Protec FW-25 offers high performance and unmatched application speed, allowing for quick forming around details and creating a completely watertight seal. The waterproofing system had to be in keeping with the aesthetic of the building, therefore Protec FW-25 was pigmented Terracotta at the clients request.

This project was completed smoothly and swiftly, keeping the building fully operational and meeting all the client’s needs. The finished walkways underwent a rigorous inspection and were approved for warranty, leaving the client extremely satisfied.